02 — Planning the run
Plan the Run Before the First Box Goes Up
Order of operations is where most self-fitted kitchens quietly go wrong. Carcasses are meant to go in before the worktop is templated and, in most layouts, before the finish floor covering is laid continuously — but after plaster has fully cured and after any tanking is signed off. Reverse that sequence and you end up packing flooring beneath fixed boxes, or templating a slab onto a run that has since shifted four millimetres.
Draw the layout and mark three things on it: every door swing that must clear its neighbour (fridge, oven, dishwasher, bin store), the plumbing stack and waste line, and each socket, switch and data point that will disappear behind a carcass. A unit that cannot open fully is a defect you discover on the day the slab arrives, at the worst possible moment.
Find your datum, not your walls
Measure floor height at three points along each wall and note the highest. Do the same at the ceiling and note the lowest. Subtract the intended worktop height — 900 mm from finished floor to slab top is the usual starting point, adjusted to the primary cook's elbow height — and you have the level line the entire base run hangs from. Everything else in this job is compensation: packing, scribing, trimming.
Prove the first corner is square
Kitchens live or die in their first corner. An error of 3 mm across a 600 mm corner propagates down the whole run and reappears at the far wall as a gap no trim can honestly hide. Diagonal-check the corner with a tape measured both ways, then plan to absorb the discrepancy with a scribed end panel rather than by twisting carcasses out of shape.
- 01Confirm wall lengths both ways, floor and ceiling.
- 02Locate studs, joists, pipes and cables before drilling.
- 03Decide plinth recess and toe-kick height now.
- 04Dry-lay every carcass on the floor, in order.
- 05Check appliance clearances against the manuals.